On the rails

Back in Strasbourg, trying to survive the canicule, after a few weeks working on the south-coast of England, there’ll probably be more about that later, and listening to the last day of the last test match of the series against the South Africans.

Staying at my parents in Twyford before and after the work I travelled through Reading a few times using the railway. It was interesting to see the progress on the redevelopment of Reading railway station. The first picture shows the new footbridge, being built over the railway to the west of the current footbridge, taken from the existing footbridge.

I am particularly interested in developments at this site as I have a personal interest in the redevelopment of the station as I played a part in starting it off when I was a councillor on Reading Borough Council, in particular as the Chair of the Transport committee. At the time I started Reading was a District Council with no power to do anything much for transport in the town. Two years later the County Council was abolished and Reading had more power on transport for the town, but not to do with the railway. However, at the start of my work in the role I had three main ambitions for the railway:

  • the redevelopment of Reading station,
  • work to Cow Lane bridges to remove a bottleneck there, and
  • Crossrail to happen with Reading as the Western terminus.

The second picture shows the new northern end of the station and the third the inside of the waiting room between what was platforms 5 and 8. From the first meeting of the Transport Committee I pushed forward on the three items. Not too long before I left the council in 1999 they were successful with a large bid to rebuild the M4 junction south of Reading, largely because the slip-roads to the motorway had become unstable and had to be rebuilt, and I was afraid that such a large amount of money being spent by the Government on the town would result in the massive amount of money necessary for the station and the bridges not to become available. Well I was wrong and the Gordon Brown government gave the go-ahead for the project and the coalition government confirmed it would happen. The project to rebuild the station that was approved included the work on the Cow Lane bridges to remove the bottleneck. In the 1990’s when I was pushing for this work to happen never in my wildest dreams did I think that the £850million work would happen so every time I travel through the station I look with great interest, and not a little pride at having played a part in it coming to pass, at the work taking place to improve the station for travellers and to remove a bad bottleneck on the rail network.

In the last decade Crossrail was given the go-ahead providing an east-west link under London giving extra capacity for people wishing to travel in those directions, whether as a whole journey or as part of it. On journey’s into London it has pleased me to see work on the scheme going ahead, whether the tunnel opening at Paddington or at different sites around London. The good news was tempered because the western end was to be Maidenhead and stop short of Reading.

From the 1990’s when the dying Major government cancelled the project Reading Borough Council’s official position was to campaign for the scheme to happen. With the encouragement of the then leader of the Council, David Sutton, as Chair of the Transport Committee I worked with the City of London to campaign for the scheme. So, in the middle of the last decade, when the then Labour Government announced consultation on the scheme I was overjoyed. However, the Leader who had been so supportive to me in campaigning for the scheme the decade before now went along with my successor, John Howarth, in his weak support for the proposal as part of Howarth’s work to undermine and deselect the Reading East MP, who was such a strong public supporter of the scheme. This lack of support and campaigning for the scheme from the Reading Council played an important part in the decision to stop short of Reading. It is a crying shame that the pathetic small town politics, of two people elected by the people of Reading to do their best for the people of Reading, has resulted in Reading missing out on what would be a bonus for them. Shame on Sutton and Howarth.

The last picture shows work taking place on new state-of-the-art train sheds between Scours Lane and Reading West junction on the west of Reading station. In the background, but perhaps not visible, are the stages and other preparations for Reading Festival.

Advertisements

Tags: , , ,

One Response to “On the rails”

  1. lista gratis barcelona Says:

    You are actually a just right webmaster. The web site loading speed is incredible. It kind of feels that you’re doing any distinctive trick. Also, The contents are masterpiece. you have performed a great process on this matter!

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s


%d bloggers like this: